
Sourcing & Vehicle Inspection Team
We source from authorised HOWO and SHACMAN dealers and inspect every unit before payment — engine, transmission, hydraulics, tyres and frame. Photo and video reports go to the buyer before shipment.

| Overall Machine Length | 6700mm Overall Machine Width |
| Overall Machine Height | 2000mm Wheelbase |
| Maximum Height | 14 m) |
| Maximum Working Height | 16 m Maximum Operation |
| Reach | 8000mm |
| Maximum Height | 14 m |
| Platform Rotation Angle | ±85° Gross Machine Mass |
| Driving speed (stowed) | 5.2km/h boom luffing range |
| Battery | :300Ah/51.2v |
| Power unit | 7Kw/32V AC |
| Auxiliary power unit | 12V DC Travel Motor |
| Drive | 4x4x2 |
| Hydraulic Oil Tank | 36L |
| Power/Rotational speed | 33.7KW/2100rpm/36KW/2600rpm/36.8KW/2400rpm |
| Drive form | 4X4 |
The fuel version 16-meter articulated boom aerial work platform has a maximum working height of 16 meters and a maximum working range of 8 meters. The articulated boom with hinge points can cross obstacles for operation.
The platform rotates at an Angle of ±85°, is driven by 4×4, has a traveling speed of 5.2km/h, and the overall length of the machine is 6700mm. It is suitable for factory maintenance, municipal garden and venue maintenance.
Factory direct supply, supporting one-stop services including whole vehicle customization, export documents, sea logistics and after-sales parts.
PLEASE SELECT TWO DISTINCT LANGUAGESThis model is designed for high-altitude operation scenarios such as factory maintenance, municipal landscaping, street lamp maintenance, and venue cleaning. When the working arm is extended, it can cover multiple layers of vertical working surfaces. Combined with the platform's rotation and luffing functions, it can complete rapid lifting operations without excavating the ground. For high-frequency and short-cycle operation demands such as power repair, curtain wall cleaning and high-position picking in warehouses, the vehicle is flexible to transfer and the outriggers occupy a small area, making it suitable for direct transfer on urban roads.
Core configuration: 4X4 drive.
When selecting the model, it is recommended to prioritize confirming three items: ① Working height and working amplitude - Choose the arm length based on the highest working point plus a 1-2 meter margin, and the amplitude requirement determines the outrigger span. ② Platform load - Select based on the combined weight of "personnel + tools + materials", and avoid long-term operation close to the rated value. ③ Chassis and Emissions - Select the chassis brand and emission stage based on the road conditions and environmental protection requirements of the operation area. Before placing an order, you can provide photos of the operation site and a description of the working conditions. We will issue a configuration plan based on your actual needs.
Delivery: Regular configurations will be scheduled for production within 15 to 25 working days, while customized upper structures will be confirmed separately according to the project cycle. Sea transportation supports three options: full truckload container, roll-on/roll-off container and frame container. All FOB/CIF/CFR terms can be operated. The vehicle documents include commercial invoice, packing list, CO certificate of origin, CIQ inspection certificate and bill of lading. Form E/Embassy certification and other documents can be supplemented as required by the destination country. Photos and videos of the shipment should be provided before shipment.
Does it support customization?
Supported. In the horsepower range, this model is driven by 4X4. The bodywork, painting and configuration can be customized as required. A configuration sheet will be issued for confirmation before placing an order. If not confirmed, production will not be scheduled.
Minimum order quantity and payment method?
You can order a single unit. Payment supports T/T (deposit + settlement before shipment) and letter of credit (L/C at sight). The payment rhythm can be negotiated for batch orders.
How to solve the problem of warranty and accessories?
The vehicle has a 3-year warranty, and the core assembly is implemented in accordance with the manufacturer's policy; it comes with a package of commonly used wearing parts. After arrival at the port, the parts are replenished by air/sea freight, and major markets have parts inventory plans.
This model is designed for high-altitude operation scenarios such as factory maintenance, municipal landscaping, street lamp maintenance, and venue cleaning. When the working arm is extended, it can cover multiple layers of vertical working surfaces. Combined with the platform's rotation and luffing functions, it can complete rapid lifting operations without excavating the ground. For high-frequency and short-cycle operation demands such as power repair, curtain wall cleaning and high-position picking in warehouses, the vehicle is flexible to transfer and the outriggers occupy a small area, making it suitable for direct transfer on urban roads.
Core configuration: 4X4 drive.
The destination port routes cover major ports in West Africa (Lome, Douala, Tema), East Africa (Mombasa, Dar es Salaam), the Middle East (Jebel Ali), the Red Sea, Southeast Asia and South America. The shipping time is approximately 25 to 50 days (depending on the route and shipping schedule). The entire vehicle can adopt the whole vehicle cabin, roll-on/roll-off or frame box scheme. Before shipment, the chassis and upper structure should be bound and reinforced, and photos should be taken for record. After arriving at the port, the telex release or original bill of lading will be arranged according to the consignee's customs clearance capacity.
How long does it take from confirmation of configuration to shipment?
Normal configuration takes 15-25 working days to complete production scheduling and testing, and customized tops are subject to the project confirmation cycle; during peak seasons (around the Spring Festival), it is recommended to reserve an extra week of buffer, and the delivery node will be stated in the contract.
Can I inspect the car before placing an order?
Yes. We support on-site vehicle inspection at the factory, and also support entrusting third-party organizations such as SGS / BV / TÜV to come to the factory for inspection; provide vehicle inspection records and shipping photos and videos before shipment.
How to deal with transportation insurance?
can provide marine insurance (PICC or international insurance terms) based on the invoice amount. CIF quotation includes insurance by default; under FOB terms, we can assist the consignee to specify an insurance plan.

We source from authorised HOWO and SHACMAN dealers and inspect every unit before payment — engine, transmission, hydraulics, tyres and frame. Photo and video reports go to the buyer before shipment.

CO / Form E, commercial invoice, packing list, bill of lading and destination-specific certificates are prepared in-house, so customs clearance is not delayed at your end.

Container, flat-rack, break-bulk and RoRo booking to any major port worldwide, with inland transport to the port of loading and loading supervision included.
Genuine spare parts dispatched within 7 days, plus 24/7 remote technical support on WhatsApp for the life of the truck. First-service parts lists are issued with every unit.


Please leave your name to start