
Sourcing & Vehicle Inspection Team
We source from authorised HOWO and SHACMAN dealers and inspect every unit before payment — engine, transmission, hydraulics, tyres and frame. Photo and video reports go to the buyer before shipment.








| Chassis | Isuzu |
| Overall Vehicle Dimensions | 5560×1840×1850mm |
| Cargo box dimensions | 1815×1520×480 mm |
| Total Mass | 3345kg |
| Curb Weight | 1930 kg |
| Emission Standard | China VI emission standard |
| Maximum Speed | 140 km/h Wheelbase |
| Fuel Tank Capacity | 70L |
| Engine | Inline four-cylinder, water-cooled, turbocharged |
| Model | 4KH1CT6H1 |
| Displacement | 2999ml Transmission |
| Power | 105kw Fuel |
| Suspended Platform Dimensions | 800×610×1100mm |
| Work Platform Load | 120kg Maximum Operating Height |
| Full boom extension | 15660 mm |
| Cab | Double-row cab |
| Maximum Working Radius | 14.8 m |
| Maximum horsepower | 105kW |
14-17 meter insulated boom aerial work platform, Isuzu chassis, overall dimensions 5560×1840×1850mm, cargo box dimensions 1815×1520×480mm, total mass 3345kg. Factory direct supply, supporting customization as needed.
Factory direct supply, supporting one-stop services including whole vehicle customization, export documents, sea logistics and after-sales parts.
PLEASE SELECT TWO DISTINCT LANGUAGESIn operation environments such as advertising installation, port lighting maintenance, and petrochemical plant inspection and repair, the advantage of aerial work platforms lies in their "immediate operation upon arrival" : the vehicle's movement and platform lifting are integrated, eliminating the time cost of crane entry and scaffolding erection. With multiple operation amplitude gears and the platform's load allowance, it can accommodate two operators and tools simultaneously, and the daily operation efficiency is significantly higher than that of the manual climbing solution.
Core configuration: 105kW power, National VI emission standards.
Before purchasing, it is recommended to clarify whether the working surface is a facade (curtain wall/wall surface) or a plane (factory roof/grid structure). For the former, the curved arm structure is preferred, while for the latter, the straight arm structure offers better cost performance. For municipal operations with high transfer frequencies, it is recommended to choose small-tonnage chassis and confirm that the entire vehicle width can pass through the operation area. If night work is required, confirm the optional installation of work lights and warning configurations. Before payment, we will provide the vehicle model, dimension drawing and operation parameter table for technical confirmation.
Export delivery process: After signing the contract and paying the deposit, production will begin. After the vehicle is rolled off the production line and completed inspection (braking, lighting, emission and road tests), the vehicle will be notified for vehicle inspection. Third-party vehicle inspection agencies (SGS/BV/TÜV) will be supported for factory inspection. Shipping routes are matched according to the port of destination, with multiple flights per week at major ports; a full set of export documents (invoice, packing list, CO, CIQ, bill of lading) are sent with the shipment, and customs clearance information at the destination port can be emailed in advance for pre-review by the consignee.
Does support customization?
Support. The horsepower range (105kW for this model) and drive form can be selected as per requirements. The upper structure, paint job and configuration can all be customized as per requirements. A configuration list should be provided for confirmation before placing an order. Production will not be scheduled without confirmation.
Minimum order quantity and payment method?
You can order a single unit. Payment supports T/T (deposit + settlement before shipment) and letter of credit (L/C at sight). The payment rhythm can be negotiated for batch orders.
How to solve the problem of warranty and accessories?
The vehicle has a 3-year warranty, and the core assembly is implemented in accordance with the manufacturer's policy; it comes with a package of commonly used wearing parts. After arrival at the port, the parts are replenished by air/sea freight, and major markets have parts inventory plans.
In operation environments such as advertising installation, port lighting maintenance, and petrochemical plant inspection and repair, the advantage of aerial work platforms lies in their "immediate operation upon arrival" : the vehicle's movement and platform lifting are integrated, eliminating the time cost of crane entry and scaffolding erection. With multiple operation amplitude gears and the platform's load allowance, it can accommodate two operators and tools simultaneously, and the daily operation efficiency is significantly higher than that of the manual climbing solution.
Core configuration: 105kW power, National VI emission standards.
The shipping plan matches the size of the vehicle according to the port of destination: conventional heavy trucks mostly use vehicle cabins or ro-ro ships, and engineering machinery can be disassembled and loaded with frame boxes to reduce freight; when space is tight in peak seasons, it is recommended to book space 2-3 weeks in advance. We complete export customs declaration and shipment according to the terms of the contract (FOB / CIF / CFR). Scanned copies of packing lists, invoices, CO and other documents are emailed to the consignee for pre-review before the originals, reducing the detention time at the destination port.
What information and accessories come with it?
The vehicle is provided with an operation and maintenance manual (in Chinese and English), certificate, wearing parts package (filters, belts, etc. are configured according to the model), and a price list of commonly used spare parts is attached for subsequent purchase reference.
What should I do if I don’t know how to operate it?
Operation videos and remote guidance will be provided upon delivery. Service engineers for major projects can be trained on board the ship or online. Instructions and maintenance cycle schedules will be emailed in advance to facilitate the recipient to arrange driver training.
Is the supply of subsequent accessories stable?
The power chain and chassis are both mainstream supporting systems. Commonly used maintenance parts are always in stock and can be transported to major markets in 5-10 days by air. Large items are replenished according to the sea transportation plan, and the parts list corresponds to the model one by one.

We source from authorised HOWO and SHACMAN dealers and inspect every unit before payment — engine, transmission, hydraulics, tyres and frame. Photo and video reports go to the buyer before shipment.

CO / Form E, commercial invoice, packing list, bill of lading and destination-specific certificates are prepared in-house, so customs clearance is not delayed at your end.

Container, flat-rack, break-bulk and RoRo booking to any major port worldwide, with inland transport to the port of loading and loading supervision included.
Genuine spare parts dispatched within 7 days, plus 24/7 remote technical support on WhatsApp for the life of the truck. First-service parts lists are issued with every unit.


Please leave your name to start